Global Success Stories
Browse cutting-edge solar projects using TrinaTracker smart tracking solutions.TongChuan China
LEARN MOREHuelva 2021 Project: Spain
LEARN MOREAustraliaClare
128MW
Maximum wind speed level 17
The main challenge in this project was the wind speed. CLARE Solar Farm is located in Region C, this is a Cyclonic Region in Australia with 212 km/h (58,88 m/s) wind speed. The other critical issue was the ground composed by expansive clays with an active layer of 2 m in depth.
ChinaHuanghe Hydropower
477MW
Gobi desert
Huanghe 477MW EHV Project faced the challenge of logistic due to COVID-19 which greatly increased the risk of delivery delay. To meet the original COD deadline, the extra shipping time was required. The solution of this pressure was real-time logistic tracking and adding 3 logistics suppliers.
JordanFALCON
23MW
Uneven terrain
Terrain slopes even higher than 20%, which required a customized mounting solution, adjusting the tables to the contour of the terrain with the purpose of reducing earth movements. In addition, fixed structure was designed for an allowable wind speed of 145mph (hurricane zone).
SpainCobra Solar Park
190MW
Mountain and hilly area
United StatesGrasshoper
103MW
Uneven terrain
ChileCapricornio
100MW
Hot and humid area